Norwegian Breakaway passengers booked on 17 Boston departures between May 2 and August 22, 2027 are being notified that Halifax will be removed, according to Cruise Fever’s November 16 report. The revised weeklong trips instead add a sea day and more time at Bermuda’s Royal Naval Dockyard.
The reported schedule brings the ship into Bermuda at 3 p.m. Wednesday, with departure at 3 p.m. Friday. That creates two overnight stays and approximately 48 hours in port, compared with the previous Thursday arrival. Boston embarkation and return times are unchanged.
Cruise Fever cites a Norwegian Cruise Line guest letter attributing the change to passenger feedback. It also reports that Halifax excursions purchased through the line will be canceled and refunded to the original payment method.
Travelers should check their own updated booking before changing independent tour arrangements. This report concerns the specified summer departures, not the removal of Halifax from every Norwegian itinerary.
Source: Original reporting.
Image: Norwegian Breakaway docked in Bermuda on October 19, 2016. Archival photograph, not the 2027 sailings. Credit: Brendan J. O'Reilly / Wikimedia Commons, CC BY-SA 4.0. May be resized or cropped for display; adaptations remain CC BY-SA 4.0.. Image source · License.
